Production

Allocation, gold plating and the art of not over-specifying

From components to PCB: how your specification determines your lead time

In our previous article, ‘Why does a chip in your product retire?’, we explained what the nanometers on a chip actually mean. This time, we’re zooming out. The availability of electronics is increasingly under pressure, and that affects lead times, prices and, ultimately, production. Where does this shortage come from? And more importantly: what choices can you make yourself to improve the availability of parts?

Surprisingly, a large part of the answer lies not in purchasing, but in the design of the product.

How AI is affecting availability

The rise of AI is driving huge demand for chips, memory and PCBs worldwide. Data centers are being built at scale, and manufacturers are increasingly focusing their production capacity on this market. After all, that is where demand is high and margins are attractive. The effects are felt further down the chain. Lead times are getting longer, prices are rising, and parts that were readily available for years can suddenly be hard to get for months on end. In the electronics industry, we call this allocation: there is simply less supply than the market demands, and manufacturers decide how the available capacity is shared out. Our buyers keep a close eye on this every day. But you can make their job a lot easier by taking the future availability of parts into account during development.

Freedom of choice starts with the design

Here’s a comparison. Say you want to get from Amsterdam to Rotterdam.
You could say: “I want a car.” Then there are thousands of cars that could get you there.
Or you could say: “I want a black Mercedes C-Class, in this trim, with this engine.” Then there’s only one car left that meets your requirements.

Electronics work exactly the same way. If the bill of materials lists a single brand and part number, only one manufacturer can supply it. If that part isn’t available, someone has to go looking for an alternative. If you define the technical requirements instead, such as the value, tolerance and temperature range, several manufacturers can often supply a suitable part. That gives you room to switch.

It’s also important to take a critical look at requirements that were once written into a design. Sometimes they are still essential, for example because of the application or the environment in which the product is used. In other cases, there is room to explore alternatives. Choosing an automotive-grade part, for instance, may be a deliberate decision. But if the product doesn’t need those specific properties, a different grade may do the job just as well. The same applies to temperature ranges and other technical specifications. By reviewing with engineers and suppliers what is functionally required, you gain more freedom of choice without compromising on the quality you need.

Recent developments around Nexperia are a good example. For certain components, alternatives turned out to be relatively easy to source, provided the certification and the customer’s BOM (bill of materials) allowed for them. That is exactly why it pays to identify alternatives during development and, where possible, have them approved.

Think ahead when it comes to certification

Certification also plays an important role. Many products have to comply with specific standards and be tested before they can be placed on the market. The way components and brands are recorded in that documentation partly determines how much room there is to replace parts later on.

If a specific brand and part number are part of the approved configuration, an alternative may require an additional assessment or recertification. If you specify the functional and technical requirements instead, there is often more room to switch within those boundaries.

Do specific brands need to be specified because of the application or regulations? Then it may be wise to include several suitable alternatives in the certification process from the start. That way, you build in flexibility up front.

The PCB: a key link in the chain

Components aren’t the only factor that determines availability. The PCB itself deserves attention too.

A PCB consists of several layers of glass fiber cloth impregnated with resin, with thin layers of copper foil in between. These are pressed together under heat and pressure to form a single rigid board. Holes are then drilled and plated with copper on the inside to connect the different layers electrically.

This base material, known in the industry as laminate and prepreg, comes from a limited number of manufacturers, mostly in Asia. The glass fabric it is made from comes from even fewer producers. Adding production capacity takes years.

So the chain runs from glass fabric to laminate, to PCB and finally to the end product. When material availability comes under pressure at the start of that chain, the effects ripple through the rest of it. The growth of AI amplifies this effect. AI servers use advanced PCBs with many more layers, thicker copper and heavier materials. These require considerably more base material than many standard PCBs, and they draw on the same raw materials and production capacity.

With PCBs, too, specifications determine how many options you have. Take FR4, a widely used base material. It comes in dozens of types, grades and brands from different manufacturers, and availability varies by type and manufacturer. When a design calls for one specific brand and type, the choice narrows. The same goes for other design choices, such as the number of layers, copper thickness, surface finish, and the size of holes and traces.

There may well be good technical reasons for all of these choices. But by reviewing them regularly with your supplier, you can find out where there are alternatives that meet the same functional requirements and quality standards.

Involve your supplier early in the design

The biggest gains depend on when you make these choices. When engineers work with suppliers and manufacturing partners during development, they can look beyond functionality and price to availability as well.

This is known as Early Supplier Involvement (ESI). By bringing together knowledge of design, components and production at an early stage, opportunities and risks become visible sooner. That makes it easier to assess alternatives, factor in availability, and make a product suitable for reliable production and future scale-up right from the start.

How Mach technology can help
At Mach technology, we bring development, sourcing and production together. This allows us to think along early in the development process about the choices that will later determine availability, quality and delivery reliability.

What we offer

  • BOM review: our engineering team looks at where requirements are unnecessarily specific, which parts are vulnerable and which technically equivalent alternatives are available. We document these alternatives so they are ready when you need them.
  • Supply chain scan: using software, we map out the bill of materials. We look at how many manufacturers can supply each part, where the risks are and where alternatives are available. This quickly gives you a clear picture of your options.
  • DFM advice on the PCB: together with our PCB suppliers, we review the design and the production process. They can point out which choices affect price, availability and manufacturability, and where alternatives are possible.

This is how we combine technical expertise with supply chain insight. Not just to build a product today, but above all to keep producing it reliably tomorrow. The best specification isn’t automatically the most extensive one. It’s the one that meets the technical requirements precisely, while leaving enough room for reliable availability.

Do you have a product in development or production, and would you like to know where there’s room to improve the availability of components and PCBs? We’d be happy to take a look. Get in touch with one of our colleagues.

©Jeffrey Backes
Sourcing and Supplier Management lead at Mach technology